This wall is going to seperate the bathrooms from the locker rooms.

Here is another view of the same wall, along with some additional ductwork, and piping.

Another section of sidewalk almost ready to be poured.

This is a picture of the new roll around tables with giant wheels so they won’t scratch the new floor.
Actually this is one of the “drawing carts”. Looking at the prints, it looks like it was probably the electricians.

The fresh air intake louver has been installed.

Drywall continues to go up, as well as pipe insulation, and ductwork.

More sidewalk has been installed.

This one is for Mr. Kaiser.

Sidewalk formed and ready to be poured.

Brick continuing to be installed on the “back” of the project.

Another door is installed.

From this image you can see the entrance doors (and side windows) that have been installed.

This image shows the fire rated drywall going up over the locker rooms.

Here is a view looking out the entrance doors.

Some of the pipe work has been done on the in-floor heating system.

The brick is almost complete. Just a little more to do on the back as seen here.

This image shows some of the piping work that is being installed.

This image shows the current status of the brick work.

This image shows the status of the entrance area. They poured the landings outside the doors today.

Some of you may be getting tired of the same view, but this is where most of the action takes place from day to day. You can see the finished stucco, and see that the shingles are complete on the front part of the locker rooms and bathrooms.

This image is looking at the enterance from inside. The opening on the left will be the doorway, and the openings on the right will be windows.

In this image you can see a couple of the new lights, and and some other mechanical items being installed.

This image shows some of the cement complete (for the bathrooms) and the locker rooms ready for cement in the foreground. The bathrooms will have torrazo floors, like the hallways in the rest of the building, and the locker rooms will have a finished and sealed cement floor.

This side of the enterance is complete. The shingles need to go on the otherside before it can be completed.

Above is a picture taken Today, and below is a picture taken 7 months ago today. Look at the changes.


This is a close up view of the glass cross that will show up nicely when events are going on inside.

More electrical equipment being installed.

Equipment scattered on the main floor.

Nice overview shot.

This image shows the brick complete on the front of the building. You can also see that they completed bricking in the glass block for the cross. They have also started the “stucco” for the front entrance.

Some of the electrical equipment has started being installed.

In this image you can see the brick complete on this wall. The furthest (4) windows have the glass blocks installed, and the only thing left to complete on the outside of this wall is to finish the front (3) windows of block.

This is from the other side of the wall, and shows the glass windows lit up. The sun is actually on the other side of the building at this point, so this is just ambient light.

This image is a little blurry, but it shows all the heating pipe that will be in the floor, and the drain pipes for the bathroom fixtures. This should have a cement floor poured fairly soon.