As you can see the wood floor is nearing completion. About 10 feet needs to be finished under the bleacher area. You can see this in the lower left corner of the picture. The orange cone is covering an electrical box mounted in the floor near the front edge of the bleachers.
The ceiling tile has been installed in the locker rooms, bathrooms, and hall areas. You can see some of it in this image.