May 18, 2009

Entrance Doors!

Filed under: Building Status Update — Webmaster @ 9:13 pm

From this image you can see the entrance doors (and side windows) that have been installed.

This image shows the fire rated drywall going up over the locker rooms.

Here is a view looking out the entrance doors.

Some of the pipe work has been done on the in-floor heating system.

The brick is almost complete.  Just a little more to do on the back as seen here.

May 13, 2009

Status

Filed under: Building Status Update — Webmaster @ 9:59 pm

This image shows some of the piping work that is being installed.

This image shows the current status of the brick work.

This image shows the status of the entrance area.  They poured the landings outside the doors today.

May 11, 2009

Ready for more cement.

Filed under: Building Status Update — Webmaster @ 9:35 pm

Some of you may be getting tired of the same view, but this is where most of the action takes place from day to day.  You can see the finished stucco, and see that the shingles are complete on the front part of the locker rooms and bathrooms.

This image is looking at the enterance from inside. The opening on the left will be the doorway, and the openings on the right will be windows.

In this image you can see a couple of the new lights, and  and some other mechanical items being installed.

This image shows some of the cement complete (for the bathrooms) and the locker rooms ready for cement in the foreground.  The bathrooms will have torrazo floors, like the hallways in the rest of the building, and the locker rooms will have a finished and sealed cement floor.

May 8, 2009

Blast from the Past.

Filed under: Building Status Update — Webmaster @ 8:54 pm

This side of the enterance is complete.  The shingles need to go on the otherside before it can be completed.

Above is a picture taken Today, and below is a picture taken 7 months ago today.  Look at the changes.

May 7, 2009

More Updates

Filed under: Building Status Update — Webmaster @ 8:46 pm

This is a close up view of the glass cross that will show up nicely when events are going on inside.

More electrical equipment being installed.

Equipment scattered on the main floor.

Nice overview shot.

May 5, 2009

Front Brick Complete

Filed under: Building Status Update — Webmaster @ 9:22 pm

This image shows the brick complete on the front of the building.  You can also see that they completed bricking in the glass block for the cross.  They have also started the “stucco” for the front entrance.

Some of the electrical equipment has started being installed.

In this image you can see the brick complete on this wall.  The furthest (4) windows have the glass blocks installed, and the only thing left to complete on the outside of this wall is to finish the front (3) windows of block.

This is from the other side of the wall, and shows the glass windows lit up.  The sun is actually on the other side of the building at this point, so this is just ambient light.

This image is a little blurry, but it shows all the heating pipe that will be in the floor, and the drain pipes for the bathroom fixtures. This should have a cement floor poured fairly soon.

April 28, 2009

Cement Floor

Filed under: Building Status Update — Webmaster @ 8:38 pm

This image shows the cement crew just finishing up the final truck load of cement for the main portion of the building.

This image shows the cement complete, but not dry :) .  This main section of the floor will have a rubber membrane, a sub-floor, and then the wood floor.

This pad of cement will hold some electrical equipment that will power the building, both new and old.

They started putting up the Styrofoam base that will support the “stucco” like on the entrances to the school.  The front entrance to the activities center will also have this system, to match the other entrances of the building.

The final picture for today is an update to the front entrance.  They completed the brick around the front of the building here.   I would guesstimate that they are now about 1/2 complete with the brick for the project.

April 26, 2009

Front Images

Filed under: Building Status Update — Webmaster @ 8:48 pm

This image shows the entrance way continuing to be worked on.

In this image shows the roof over the locker rooms and bathrooms, as well as the brick going up on the main part of the activities center.

This image is a “straight on” view of the entrance way.

They had to remove the plywood from the outside of the cross so they could start installing the glass block into it.  This is what it looks like from inside.

April 15, 2009

Brick and Floor.

Filed under: Building Status Update — Webmaster @ 10:35 pm

This image shows the front of the building as it currently stands.

This image shows the preparation of the main area for pouring of the floor.

The brick continues to go up.

Here is another overview of the entire project.

April 8, 2009

Final Batch of Trusses Arrive…

Filed under: Building Status Update — Webmaster @ 9:23 pm

This is an image of what it currently looks like inside the main part of the building.  The bright sun is comming in the south east emergency exit.

This image shows the styrofoam awaiting installation on the floor before the concrete is poured.  This will insulate the floor from the cold ground underneath.

This wall is almost completely bricked.  Just a little more to go.

Here is a wide angle shot of the entire project area.  To the right of the picture you can see the rest of the trusses staged for installation.

Here is another overview shot, but from a different angle.  You can see that the front wall is almost completed with brick also.

The final image for today shows the other side of the building where a new entrance way will be going in, and the new pitched roof has replaced the flat roof.